Facilities managers can overcome reactive building operations by moving toward centralized, integrated platforms that enable real-time monitoring and coordination.
The key to unlocking significant energy savings and performance gains is for facilities managers to prioritize operational excellence before turning to costly capital upgrades.



DMF Lighting: True 1
Linmore: LifeTimeLED
Cerno: Revelite CL-6
Alloy LED: Radialux 5.5 COB RGBTW Tape Light
Synapse Wireless: SNV-CS-10 Combo Sensor Controller
DMF Lighting: Premier 0.5 Linear
Sabin: TAPER
ETC: Response DALI Gateway MK2
DMF Lighting: H Series
Cerno: Revelite CL-6
Alloy LED: Mudr Perimeter 1 in. & 2 in.
Alloy LED: Primapanel Tunable Flexible LED Sheet
Kenall: SimpleSeal CSSETO
Alloy LED: PrimaPanel RGBW Flexible LED Sheet
Genlyte Solutions: Gardco OptiForm Flood
Kenall: MedMaster Pillow and Pillow Slot
Alloy LED: VariTune 4.3 COB Tunable Tape Light
Cerno: Revelite AL and CL
Optique Lighting: Perifina Wall Accent
Cerno: Catalina
AMP Lighting: AMP Secure Contemporary Flood Lights
LightArt: Somari Collection
Genlyte Solutions: Gardco SoftView Gen 4 LED
Alloy LED: VariTune RazorLine 6.1
Sabin: LINEAR
Luminii: STENOS Square
Optique Lighting: Perifina Wall Flood 2 in.
DMF Lighting: M Series Downlighting Family
ETC: Source Four Mini LED Plus
Alloy LED: ThermaLine 3