Facilities managers can overcome reactive building operations by moving toward centralized, integrated platforms that enable real-time monitoring and coordination.
The key to unlocking significant energy savings and performance gains is for facilities managers to prioritize operational excellence before turning to costly capital upgrades.



Diesel-powered generator sets can start and assume load in less than 10 seconds and can assume rated load in a single step, according to the company. Generator sets are available in sizes ranging from 10 kW to 2.5 MW, in both 50Hz and 60Hz. Optional factory-integrated exhaust after-treatments are designed to reduce emissions.