Facilities managers can overcome reactive building operations by moving toward centralized, integrated platforms that enable real-time monitoring and coordination.
The key to unlocking significant energy savings and performance gains is for facilities managers to prioritize operational excellence before turning to costly capital upgrades.



The WattNode BACnet meter (MS/TP) provides line-powered single- and three-phase, wye, or delta configurations up to 600 Vac and 6000 A. Enables building automation system access to electrical measurements including power, energy, voltage, current, and power factor. Offers more than 50 electric power-related measurements, 64 addresses, and selectable baud rates up to 76.8K.