CES Group. Click here.
Firestone Roofs to Rooftops, click here... Automated Logic

On the Move: Portable Heating and Cooling

Part 1: Portable Heating and Cooling: Specification Starts with Facility Analysis

Part 2: Applications for Portable Heating and Cooling Grow

Part 3: Common Mistakes in Specifying Portable Heating and Cooling Equipment

Part 4: Portable Heating and Cooling: Quantify a Room's Heat Load

Part 5: Portable Heating and Cooling: Key Questions

Part 6: PRODUCT FOCUS: Portable Heating and Cooling


Portable Heating and Cooling: Quantify a Room's Heat Load

By Dan Hounsell, Editor - January 2010 - HVAC


Managers can avoid making these and other mistakes by carefully gathering essential information about the space to be cooled before they begin the specification process.

First and foremost, they need to quantify the heat load for the area the equipment will serve by using the size of the room, including the height of the ceiling. Another space consideration involves the space in which the facility will house the cooling or heating unit.

Armshaw also advises managers to know the type of power available, as well as the options for exhausting the hot air generated by the equipment. In server rooms, he says, managers need to know the number of servers and whether the area is served by an uninterruptible power supply.

Another necessary piece of information for manufacturers or distributors is information on the operations that take place in the space.

"If the space is going to be used by a lot of people in suits and ties, the equipment will need to provide more cooling. We need to know that," Armshaw says. "Bring all of that information to the table."

Tagge advises managers to provide accurate information on power restrictions.

"With 110 volts, you can only go so big in terms of capacity," he says. "It narrows down your equipment options."

Finally, managers need to understand options for removing condensate from units, whether it occurs by technicians emptying a tank on the unit or by attaching a drain hose that directs condensate down a drain.

Comments

Add a comment

Prev

Next




On the Move: Portable Heating and Cooling

Part 1: Portable Heating and Cooling: Specification Starts with Facility Analysis

Part 2: Applications for Portable Heating and Cooling Grow

Part 3: Common Mistakes in Specifying Portable Heating and Cooling Equipment

Part 4: Portable Heating and Cooling: Quantify a Room's Heat Load

Part 5: Portable Heating and Cooling: Key Questions

Part 6: PRODUCT FOCUS: Portable Heating and Cooling



RELATED

Browse articles on portable heating and cooling, hvac, heating and cooling, server rooms on FacilitiesNet

FACILITYZONE SEARCH

Search for portable heating and cooling, hvac, heating and cooling, server rooms articles on FacilityZone

Modine. Save Thousands of Dollars in Energy & Thousands of Pounds in CO2. Click here.



Schooling the competition for 25 years. Aerco, click here.




*************************

Free E-mail Newsletter Sign-up

Weekly Articles
Facility Webcast Alerts
Building Products/Technology
Monthly Digital Magazine


4 - 4  = (anti-spam)

*************************
*************************
*************************