Project Profile: Resort Adds New Hotel

Part 1: Maintenance Plays Key Role in Building Addition

Part 2: Managers Minimize Disruption to Resort Occupants

Part 3: Heat Exchangers Eliminate Pressure Differential

Part 4: Demand-Response Program Leads to Potential Savings

Part 5: Resort Retrofits Wastewater-Treatment System


Heat Exchangers Eliminate Pressure Differential

By Chris Matt, Managing Editor - Print & E-Media September 2009 - HVAC

The difference in elevation between the new tower and the existing building was a primary cause of the engineering and maintenance challenges Morris and his staff faced, especially as they related to HVAC.

“We used the existing boilers (from the hotel and casino) for the heating system,” Morris says. “We added heat exchangers to separate the systems — the old from the new — and created enough head pressure for the new tower so it wouldn’t affect the boiler operation at a lower pressure.”

Morris considers adding the heat exchangers to be a medium-sized project. Technicians dedicated a great deal of time, paid attention to detail, and performed the required engineering, but he says the retrofit was nearly flawless, aside from a few kinks and bugs technicians ironed out.

“We had some problems with the initial installation of the heat exchangers and had to do some re-modification and re-engineering just because the pressure differential was so great,” Morris says. “Ultimately, using the heat exchangers and making some modifications, we were able to pull it off.”

While the new hotel shares boiler operation with the casino, the resort did install chillers for the new tower. Morris and his team also specified a four-pipe HVAC system for the addition.

“We wanted to use the four-pipe system so we could both heat and cool the different areas at the same time,” he says. “Our guests being the main concern, we wanted to make sure it was comfortable for them.”




Project Profile: Resort Adds New Hotel

Part 1: Maintenance Plays Key Role in Building Addition

Part 2: Managers Minimize Disruption to Resort Occupants

Part 3: Heat Exchangers Eliminate Pressure Differential

Part 4: Demand-Response Program Leads to Potential Savings

Part 5: Resort Retrofits Wastewater-Treatment System


Comments

Browse Articles

On FacilitiesNet: hvac, plumbing, heat exchangers,

Find us on Google+

Modine. Learn more.
Leading the way in high efficiency boilers and water heaters. Aerco, click here.


QUICK Sign-up - Membership Includes:

New Content and Magazine Article Updates
Educational Webcast Alerts
Building Products/Technology Notices
Complete Library of Reports, Webcasts, Salary and Exclusive Member Content

All fields are required.


click here for more member info.