fnPrime


Snow and Ice Management: Preparing Grounds for Winter's Worst

Managers who take proactive steps now can ensure their teams and equipment are prepared for whatever colder weather brings to facilities.   November 19, 2026


By Cheryl Higley, Contributing Writer


Key takeaways 

  •  Define the service plan at each site. Walk the property to confirm service triggers, timeframes, priority areas, scope, hazards and access constraints—and document the findings in a site engineering plan. 
  • Get equipment ready before winter. Set a maintenance schedule, order critical parts early, inspect trucks, plows and spreaders, and calibrate application equipment to use materials effectively. 
  • Train and rehearse the team. Provide preseason safety and equipment training for all employees, then run site walkthroughs and full practice runs to catch problems before a storm. 

What will this winter bring? It is too early to tell, but one thing is certain: It is time for grounds managers to get their teams and equipment ready. Taking proactive steps now will ensure they are prepared for whatever comes. 

In an ideal world, it is an industry best practice for managers to start winter preparations before November, so they can properly allocate equipment and staff or identify where to add resources. Once those pieces are in place, focus on these steps for every property. 

Walk the site and review the level of service and scope of work. The level of service refers to the expected outcomes for the site. According to the National Standard for Procuring and Planning Snow and Ice Management Services from the Snow & Ice Management Association in 2025, important details to confirm include:  

  • Service initiators. What triggers the dispatching of resources? 

  • Critical timeframes, including shift changes, employee traffic, delivery times, etc., that might impact the ability to service safely and effectively 

  • Priority areas that should be serviced first, such as sidewalks, emergency access and handicap parking stalls.  

  • Post-storm follow-up expectations, including site monitoring responsibilities.

While the level of service defines what needs to happen, the scope of work lays out the actions that will be taken to achieve it. It is important to clarify details: 

  • site boundaries, service areas and services that will be provided, such as snow removal, deicing and hauling 

  • anti-icing and deicing chemicals that can and cannot be used and whether they can be stored on-site 

  • equipment to be used for service, including whether operators are required to stage dedicated equipment. 

During the site walkthrough, managers should identify and document the following items, since it will shape the service approach: 

  • any changes to the site since it was last serviced 

  • potential safety hazards and damage that should be repaired or replaced before the season, such as broken curbs, potholes and clogged downspouts 

  • ingress and egress roads and walkways 

  • potential obstructions and site-specific variables that could hinder service or access, such as security zones or locked gates 

  • proximity to environmentally sensitive areas — water sources, for example — and any environmental regulations 

  • site features that might produce hazardous conditions during or between weather events, such as slopes, drainage issues, parking decks and awnings 

  • structures or areas that could block snow equipment or impede service delivery, including dumpsters, cart corrals, speed bumps, islands, bollards and parked vehicles 

  • surfaces or structures that require special attention to maintain public access and safety, such as emergency exits, fire hydrants and handicapped parking spaces. 

Managers can take everything learned during the site visit and create a site engineering plan to share with employees and executives so everyone is on the same page.

Equipment preparation 

A lot is still happening on the green side in early fall, which can push preparing the winter fleet far down the to-do list. Managers need to avoid being unprepared for an early or even the first snowfall, so they can take these steps to make sure equipment is ready to roll: 

Create a readiness schedule. Identify the snow season kickoff date and calculate the amount of time teams need to prepare equipment. Use that date to create a fleet maintenance timeline. Leave plenty of time to avoid having to rush to finish, knowing that current season maintenance and breakdowns might temporarily derail the schedule. If needed, start small by preparing one or two trucks with plows and spreaders now in case of an early storm and add more to the rotation as winter nears.  

Order parts early. The closer managers get to the start of the season, the more likely it is that parts will be on back order. Plan to purchase parts that tend to break more often, as well as major parts, such as plow pumps and spreader motors, that might be hard to come by in the middle of a storm.  

Equipment prep. Clean, repair and service winter equipment before putting it away at the end of the season. But even with proper storage, issues can still arise and should be caught early. Once autumn arrives, operators should pull out key pieces of equipment to inspect, connect and test its operation:  

Trucks. Start with a thorough pressure wash and inspection and make necessary repairs. Check all electrical systems — including batteries, starters, alternators and wiring — to ensure everything is connected and in good condition. Inspect hydraulic systems for leaks or damaged hoses. Finally, change the oil and filters, and conduct a full check of all lights and connections. 

Plows. To keep plows in good working order, start by flushing and replacing the hydraulic fluid and checking the cutting edges for signs of wear. Inspect and tighten all hoses, fittings and fasteners, pivots and pins. Clean the electrical connections, test the battery and charging system and verify that the plow and truck lights are functioning correctly. Finally, do a complete inspection to identify signs of mechanical damage that might need attention. 

Spreaders and sprayers. Inspect and tighten all hoses, fittings, set screws and fasteners while checking for mechanical damage or chain tension issues. Clean electrical connections, lubricate all fittings and service the gearboxes. Do not forget to check the pumps on liquid applicators for leaks and inspect nozzles and spray bars for damage or blockages to confirm that the correct nozzles are properly installed and ready for service. 

Don’t forget to calibrate. The easiest way to waste salt, which may be in short supply again this winter, is using spreaders and sprayers that have not been properly calibrated. Establish a consistent process, and calibrate equipment before the season starts, mid-season and whenever mechanics make equipment repairs or significant material changes. Be sure to document these settings, rates and maximum output for each site and include this information in the team's preseason training.  

Training and orientation 

Training significantly reduces the risk of workplace injuries. Beyond safety, well-trained operators are less likely to cause costly property or equipment damage, saving the headache of repairs and insurance claims. It also bolsters the defense against liability and slip-and-fall claims by ensuring the team can proactively identify and mitigate hazards.  

Managers can gather teams before the snow season begins to cover safety, equipment operation and standard procedures. Proactively identifying training needs allows managers to plan and schedule the training without the pressure of an impending storm. 

All employees — even the most seasoned veterans — should participate in preseason training that combines classroom training with hands-on practice. Important areas to cover include personal health and safety, equipment safety and operational efficiency, yard safety and chemical safety.  

Once the material has been taught, managers should put it to the test with dry runs that replicate the conditions operators will encounter on-site. For example, have crews drive their assigned routes. Walk the sites with the site engineering plan and site maps to identify potential hazards, stacking areas, priority areas and other details that are covered in the service plan. Perform a full mock run from beginning to end in the dark to test response times, routes, equipment operations and procedures. It is better to identify potential hiccups during training than in the middle of a storm. 

By focusing on these critical pillars — walking the site, ensuring your equipment is field-ready and investing in comprehensive team training — managers can build a foundation for operational excellence. Taking these steps now ensures that the team is ready to deliver safe, efficient and high-quality service all winter long. 

Cheryl Higley is education and content director with the Snow & Ice Management Association (SIMA). SIMA offers training programs and resources to help grounds managers and snow and ice professionals prepare for winter. Access safety training programs at sima.org/safety. 

Next


Read next on FacilitiesNet