Facilities managers can overcome reactive building operations by moving toward centralized, integrated platforms that enable real-time monitoring and coordination.
The key to unlocking significant energy savings and performance gains is for facilities managers to prioritize operational excellence before turning to costly capital upgrades.



Dur-A-Glaze Rapid-Patch makes quick work of filling holes, cracks and spalls up to 1/4-inch thick. Its no-sag consistency is designed for use on vertical, horizontal, and overhead surfaces and is ready for grinding in one-two hours. The zero-volatile-organic-compound, two-part epoxy system offers a consistent, workable mixture every time. The produce finishes off with a trowel, spackle knife or flat squeegee. Thin film applications — 2 mils or less — cure in less than two hours. Thicker applications up to 1/4-inch cure in one hour.