fnPrime


Why Geothermal HVAC Deserves a Place in Capital Planning



Facility managers should evaluate geothermal HVAC alongside conventional systems when planning long-term capital projects.


By Ronnie Wendt, Contributing Writer  
OTHER PARTS OF THIS ARTICLEPt. 1: How Geothermal HVAC Cuts School Energy Costs and Improves ComfortPt. 2: How New Geothermal Technology Makes HVAC More Practical for SchoolsPt. 3: This Page


Both districts selected geothermal only after evaluating lifecycle costs, sustainability goals and long-term building performance. 

Barnes says that’s one of the biggest misconceptions surrounding geothermal. Successful projects don’t begin with selecting a heating and cooling system. They begin with a feasibility study that evaluates building loads, site conditions, available land, lifecycle costs and incentive opportunities before determining whether geothermal is the right solution. 

According to Barnes, geothermal decisions should always start with a thorough evaluation. 

“If you’re going to own that building for 40 or 50 years, you owe it to yourself to understand all the options before you move forward,” he says. 

Lessons for facility managers 

The experiences of Waunakee and North Shore school districts highlight several practical lessons for facility managers evaluating geothermal. 

  • Start Early. Begin the conversation early. Geothermal affects site planning, building design and mechanical system selection, making it difficult to introduce late in the design process. 
  • Know the Data. Base decisions on objective data rather than assumptions. Long says comprehensive feasibility studies should evaluate building loads, ground conditions, available land and whether energy-efficiency improvements could reduce the size and cost of the geothermal system before drilling begins. 
  • Think Long Term. Facilities expected to operate for 40 to 50 years benefit by evaluating utility savings, maintenance requirements and equipment longevity, rather than making mechanical purchase decisions on budget alone. 
  • Track Innovation. Recognize that geothermal continues to evolve. Conventional systems, like those operating successfully in Waunakee, have shown reliable long-term performance for years. Emerging technologies such as Dynamic Closed Loop geothermal may now allow facilities with limited available land to realize those same benefits. 

FacilitiesNet Recommends: Des Moines Public Schools Embraces HVAC Upgrades

Before moving forward, organizations should also understand available financial incentives and compliance requirements. Doug Kolker, who advises organizations on clean-energy tax incentives, says early financial planning is just as important as engineering design when maximizing project funding. 

“It’s best to bring in all the team members as early on as possible to help educate everybody that is involved in the project,” Kolker says. “There are deadlines based on their fiscal or calendar year ends, so it’s really important to have these conversations as early on as possible.” 

Looking ahead 

Waunakee Community School District proved what geothermal can accomplish over the long haul. North Shore School District 112 is exploring what the technology can become. 

Together, the two projects show that the conversation around HVAC is changing. Facility managers no longer have to choose between operational performance and sustainability or between innovation and fiscal responsibility. 

Instead, they illustrate that geothermal has matured from a niche solution to a practical option for a growing number of schools and institutional facilities. Advances in system design, stronger financial incentives and years of proven performance are expanding geothermal’s reach and strengthening its business case. 

For organizations facing major HVAC replacement cycles, geothermal should no longer be viewed as an alternative technology outside the mainstream planning process. It should be evaluated alongside conventional heating and cooling options as part of a broader capital planning discussion.  

For facility managers facing aging infrastructure, the question is no longer simply whether geothermal works or whether it is practical, but whether it belongs in their next capital project. 

Ronnie Wendt is a freelance writer based in Minocqua, Wisconsin.




Contact FacilitiesNet Editorial Staff »

  posted on 8/21/2026   Article Use Policy




Related Topics: