FM Complaints eBook, order your copy today >

Readers Of This Article, Check Out:
On the Go? So Are Germs: InfoGraphic - Sponsored Learning

Firestone, click here...

Building Envelopes: Component Inspections and Replacement

Part 1: Building Envelopes: Minimize Air, Water Leaks

Part 2: Building Envelopes: Inspection Requirements for EIFS

Part 3: How to Replace Building-Envelope Components


How to Replace Building-Envelope Components

By James Piper, P.E. - September 2010 - Windows & Exterior Walls


Regular inspections can reveal the condition of the building envelope. By tracking these inspections over time, managers can identify trends in component condition and performance. As the number of problems with a particular component increases, managers can begin the process of looking for a replacement product. Even with the best maintenance, time, use, and exposure will take their tolls on envelope components. Eventually, some components will reach the point at which it is not economical to continue to maintain them. Replacement becomes the most appropriate option.

This situation opens a range of options for managers. It gives them the opportunity to select replacement materials that offer lower maintenance requirements, improved aesthetics, increased energy efficiency, or all of the above. For the replacements to work, managers must carefully consider the options available to them. They must closely examine and compare materials and envelope systems. For energy efficiency, that often means modeling the performance of the building envelope and analyzing the energy impact of various options to see which offers the fastest return on investment.

Managers might have to make trade-offs when selecting options for a particular building. But by evaluating different building-envelope options and scheduling their replacement, managers can have it all — improved energy efficiency, reduced maintenance costs, and more effective building protection, while remaining cost competitive.

James Piper, P.E., is a national consultant based in Bowie, Md., with more than 25 years of experience in facility maintenance and engineering management.




Building Envelopes: Component Inspections and Replacement

Part 1: Building Envelopes: Minimize Air, Water Leaks

Part 2: Building Envelopes: Inspection Requirements for EIFS

Part 3: How to Replace Building-Envelope Components


Comments


Browse Articles

On FacilitiesNet: building envelope, walls, insulation, maintenance and operations, energy efficiency

FaciliyZone

Search for building envelope, walls, insulation, maintenance and operations, energy efficiency articles on FacilityZone

Find us on Google+
65 Crazy, Outrageous Occupant Complaints. Order your copy today >


QUICK Sign-up - Membership Includes:

New Content and Magazine Article Updates
Educational Webcast Alerts
Building Products/Technology Notices
Complete Library of Reports, Webcasts, Salary and Exclusive Member Content



click here for more member info.