Advertisement
Firestone Building Products, Download App Automated Logic

UPS: Power-Management Strategies

Part 1: Uninterruptible Power Supplies: Implementing a Protection Plan

Part 2: A Checklist for Testing, Maintaining Uninterruptible Power Supplies

Part 3: UPS Replacement: Analyze Payback, Life-Cycle Costs

Part 4: Power Management: Four Common UPS Technologies


UPS Replacement: Analyze Payback, Life-Cycle Costs

By Michael Newbury - September 2010 - Power & Communication


Two scenarios exist in which managers would need to replace a UPS. Either it has reached its load capacity, or a maintenance check has determined the batteries have reached their useful life and require replacement.

When it becomes apparent it is time to replace a unit, maintenance and engineering managers need to build a business case that analyzes both a simple payback and life-cycle costs. Providing both of these analyses will allow upper management to understand the financial impact and allocate funds for replacement. Managers can avoid providing maintenance and upgrades to old equipment by purchasing a newer technology unit that cuts labor costs and improves system reliability.

Comments

Add a comment

Prev

Next




UPS: Power-Management Strategies

Part 1: Uninterruptible Power Supplies: Implementing a Protection Plan

Part 2: A Checklist for Testing, Maintaining Uninterruptible Power Supplies

Part 3: UPS Replacement: Analyze Payback, Life-Cycle Costs

Part 4: Power Management: Four Common UPS Technologies



RELATED

Browse articles on ups, uninterruptible power supplies, uninterruptible power supply, life-cycle costs on FacilitiesNet

FACILITYZONE SEARCH

Search for ups, uninterruptible power supplies, uninterruptible power supply, life-cycle costs articles on FacilityZone


ASCO. Click here...




*************************

Free E-mail Newsletter Sign-up

Weekly Articles
Facility Webcast Alerts
Building Products/Technology
Monthly Digital Magazine


1 + 3  = (anti-spam)

*************************
*************************
*************************