close
logoAdloadimgUGL Services and DTZ have united to form one company. Learn more > Advertisement
FacilityZone, powered by Google
Firestone Roofs to Rooftops, click here... Automated Logic

LEED Certification: Whole New Ball Game

Part 1: Philips Arena Achieves LEED Certification

Part 2: Sports Arenas Pose Maintenance and Engineering Challenges

Part 3: LEED Certification: Hardscape Management and Water-Conservation Strategies

Part 4: HVAC, Lighting Retrofits Fuel Arena's LEED Certification

Part 5: Arena Hires LEED AP During Certification Process


Sports Arenas Pose Maintenance and Engineering Challenges

By Chris Matt, Managing Editor - Print & E-Media - August 2009 - IAQ


A facility that houses two teams whose seasons align is a formidable challenge for a maintenance and operations department, especially when one of the teams plays on a sheet of ice.

“You’ve got to cool and get your environment correct for that ice sheet,” Henson says. “Hockey is a sport where science dictates your atmosphere. High humidity in a building is going to do two things: the humidity is going to condense on your ice sheet, or it will cause fog in your building.”

The hockey team often practices in the morning before playing a game that same night. Technicians have to cool the facility during the day so when fans enter the building, the indoor environment will remain ideal for hockey.

“Condensation on a sheet of ice is the worst thing that can happen to it because it’s like skating on sand,” Henson says.

Philips Arena and other similar facilities also have unique lighting requirements, compared to other commercial buildings. The arena runs 1,000-watt lamps in 230 fixtures. Technicians have to turn off the lights when not in use, but they must plan ahead because the lights have a 20-minute cool-down period before workers can turn them back on — a key consideration in a multi-purpose facility.

“You have to know what’s coming next or who’s using the facility next prior to turning them off,” Henson says.

The arena’s HVAC and lighting systems are tied into a building automation system, which is important for a facility with an erratic schedule.

“You have to maintain some lights and some environmental controls while (workers are) cleaning, or your staff is going to be taxed long before they get finished,” Henson says. “That’s the main difference (between) an office building and an arena.”

Comments

Add a comment

Prev

Next




LEED Certification: Whole New Ball Game

Part 1: Philips Arena Achieves LEED Certification

Part 2: Sports Arenas Pose Maintenance and Engineering Challenges

Part 3: LEED Certification: Hardscape Management and Water-Conservation Strategies

Part 4: HVAC, Lighting Retrofits Fuel Arena's LEED Certification

Part 5: Arena Hires LEED AP During Certification Process



RELATED

Browse articles on maintenance and engineering, hvac, iaq, lighting on FacilitiesNet

FACILITYZONE SEARCH

Search for maintenance and engineering, hvac, iaq, lighting articles on FacilityZone



Find us on Google+
Critical Facilities

NFMT Vegas, September 17-18 2013


*************************

Free E-mail Newsletter Sign-up

Weekly Articles
Facility Webcast Alerts
Building Products/Technology
Monthly Digital Magazine



*************************
*************************
*************************