Readers Of This Article, Check Out:
Electrical Preventive Maintenance ... Pay Now or Pay (More) Later - Sponsored Learning

On the Go? So Are Germs: InfoGraphic - Sponsored Learning

Firestone, click here...

HVAC

Part 1: Identifying Energy Waste in HVAC and Electrical Systems

Part 2: Components to Consider When Identifying Energy Waste

Part 3: ROI Important Metric for Conservation Measures

Part 4: Comprehensive Preventive Maintenance Program Helps Extend Equipment Life


Comprehensive Preventive Maintenance Program Helps Extend Equipment Life

By David Cosaboon - December 2012 - Energy Efficiency


Aside from the implementation cost, which is a relatively fixed cost, the driving factor for a good ROI is the cumulative savings, which are a function of annual cost savings and the equipment's useful life. The best method of maintaining annual cost savings and extending the useful life of an asset is through a comprehensive preventive maintenance (PM) program.

PM is interval-based work that is planned and scheduled to maximize efficiency, minimize excessive labor and parts replacement, and prolong the useful service life of equipment. With few exceptions, PM is the most effective way to successfully maintain building systems and extend equipment service life.

It is rare to see a building that does not have any opportunities to improve its energy efficiency. Responding to the steady rise in energy costs nationwide, manufacturers continue to develop and release new and novel technology.

Not all new technology is appropriate or worthwhile for a particular facility, but managers who carefully consider the potential savings and ROI of measures to improve energy efficiency can gain a better understanding of the options that deserve further consideration.

David Cosaboon, LEED AP O&M, is a project engineer with Facility Engineering Associates in Fairfax, Va.




HVAC

Part 1: Identifying Energy Waste in HVAC and Electrical Systems

Part 2: Components to Consider When Identifying Energy Waste

Part 3: ROI Important Metric for Conservation Measures

Part 4: Comprehensive Preventive Maintenance Program Helps Extend Equipment Life


Comments


Browse Articles

On FacilitiesNet: hvac, roi, return on investment, vfd, electrical systems

FaciliyZone

Search for hvac, roi, return on investment, vfd, electrical systems articles on FacilityZone

Find us on Google+
3M Window Films
65 Crazy, Outrageous Occupant Complaints. Order your copy today >
QA Graphics


QUICK Sign-up - Membership Includes:

New Content and Magazine Article Updates
Educational Webcast Alerts
Building Products/Technology Notices
Complete Library of Reports, Webcasts, Salary and Exclusive Member Content



click here for more member info.